Debris and haul-off estimator

Dumpster Size Calculator

Estimate loose debris yardage and a suggested roll-off dumpster size from debris pile dimensions, depth, and bulking factor.

Units
Suggested dumpster
Loose debris volume
Measured volume
Estimated cost

Dumpster limits are not only volume

Weight limits, prohibited materials, fill-line rules, access, swap-outs, local hauler sizes, and heavy debris like concrete or dirt can require a smaller or different container.

VibeCalc Android app icon
Android App

Need dumpster size and debris volume estimates hands-free?

The Android app adds the jobsite workflow: voice input, offline use, material lists, PDF export. Free, no ads, no accounts.

Get the Free App Free. Built for Android phones. Donations welcome.

Saved you a mistake? Support VibeCalc

Related

Concrete Weight Calculator

Check heavy debris weight before choosing a roll-off.

Related

Excavation Volume & Cost

Estimate dirt cut volume, swell, haul loads, and cost.

Related

Labor Cost Calculator

Estimate crew time and project labor cost.

View all

Dumpster size formula

Measured yd³ = length × width × depth ÷ 27

Loose yd³ = measured yd³ × bulking factor

Suggested size = next common 10, 15, 20, 30, or 40 yd dumpster

Example

A 12 ft by 8 ft by 4 ft debris pile is 14.2 bank yd³. With a 1.25 bulking factor, plan about 17.8 loose yd³, so a 20 yd dumpster is the first fit.

Dumpster Size Calculator FAQ

How does this dumpster size calculator work?+

It multiplies measured job dimensions by the coverage, spacing, or package yield you enter, adds waste, then rounds the buy quantity up. Volume only chooses a first-fit size. Weight limits and hauler rules still matter.

Should I use the default waste value?+

Use the default for a quick planning estimate, then raise it for cuts, odd layouts, breakage, bad access, or product-specific loss.

Is this a bid or code approval?+

No. It is a material planning calculator. Verify product data, local code, structural requirements, electrical requirements, and supplier packaging before ordering or building.